Volume 8 , Issue 2 , PP: 46-53, 2024 | Cite this article as | XML | Html | PDF | Full Length Article
Heba Eid 1 * , Alaa Kadi 2 , Hadi Kherbeic 3
Doi: https://doi.org/10.54216/IJBES.080205
This research aims to highlight the importance of Building Information Modeling (BIM) in improving the management and operation of existing buildings. The study illustrates that achieving integrated functional performance for buildings requires the adoption of modern technologies, especially in the operational phase of their lifecycle. Despite BIM being primarily used in the design and construction phases, its application in operation and maintenance remains limited due to certain challenges, such as information management. The research presents a case study of Homs Museum as a model of a facility that relies on traditional methods for its operation, where BIM was applied to enhance three operational aspects: the container (building modeling and space occupancy), the content (indexing and classifying artifacts), and the user (staff management and BIM adoption within the institution). The results showed that BIM significantly enhances operational information management with high flexibility, underscoring the necessity of its adoption in existing buildings. The research recommends increasing the reliance on BIM in the operational phase, supporting its use in existing buildings through training and providing data collection tools, and developing user-friendly software interfaces for project managers.
Building Information Modeling (BIM) , Facilities Management , Operation and Maintenance , Existing Buildings , Building Lifecycle
[1] |
Ahmed Fahim Elgendi, Ashraf Elhendawi , Waleed Mahfouz M. A. Youssef, Abdul Salam Darwish, "The Vulnerability of the Construction Ergonomics to Covid-19 and Its Probability Impact in Combating the Virus," International Journal of BIM and Engineering Science, vol. 4(1), pp. 1-18, 2021. |
[2] |
M A Hossain, J K W Yeoh, "BIM for existing buildings: potential opportunities and barriers," in IOP Conf. Series: Materials Science and Engineering 371, 2018. |
[3] |
A. I. N. Elhendawi, "Methodology for BIM implementation in KSA in AEC industry," Edinburgh Napier University, UK, 2018. |
[4] |
M. Y. Younes, "Achieving optimal lighting to improve the functional performance of the museum using computer simulation case study: Lattakia Museum in Syria," International Journal of BIM and Engineering Science, vol. 5(2), pp. 19-37, 2022. |
[5] |
Joud Mohammad Shbeeb, Lama Adel Saoud, "Enhancing facility management for buildings using BIM (case study: model of a medical building)," International Journal of BIM and Engineering Science, vol. 7(2), pp. 8-24, 2023. |
[6] |
Qiuchen Lu, Long Chen, Sanghoon Lee, Xiaojing Zhao, "Activity theory-based analysis of BIM implementation in building O &M and," Elsevier, 2018. |
[7] |
Haretha Aljabr, Mohammed Ali, "Integration of Building Information Modeling and Project Management Process," International Journal of BIM and Engineering Science, vol. 8(1), pp. 8-17, 2024. |
[8] |
Sonia Ahmed, Petr Dlask, Omar Selim, Ashraf Elhendawi, "BIM Performance Improvement Framework for Syrian AEC Companies," International Journal of BIM and Engineering Science, vol. 1(1), pp. 20-41, 2018. |
[9] |
Ashraf Elhendawi, Andrew Smith, Emad Elbeltagi, "Methodology for BIM implementation in the Kingdom of Saudi Arabia," International Journal of BIM and Engineering Science, vol. 2(1), pp. 1-20, 2019. |
[10] |
Martin Evans, Peter Farrell, Emad Elbeltagi, Ayman Mashali, Ashraf Elhendawi, "Influence of Partnering Agreements Associated with BIM Adoption on Stakeholder’s Behaviour in Construction Mega-Projects," International Journal of BIM and Engineering Science, vol. 3(1), pp. 1-17, 2020. |
[11] |
Rania Salman, Rana Maya, "Effects of Applying Bim on facility management for existing Buildings," International Journal of BIM and Engineering Science, vol. 7(1), pp. 72-86, 2023. |
[12] |
Ayman Mashali, Ahmed El tantawi , "BIM-based stakeholder information exchange (IE) during the planning phase in smart construction megaprojects (SCMPs)," International Journal of BIM and Engineering Science, vol. 5(1), pp. 8-19, 2022. |
[13] |
Fawaz Saleh, Ashraf Elhendawi, Abdul Salam Darwish, Peter Farrell, "A Framework for Leveraging the Incorporation of AI, BIM, and IoT to Achieve Smart Sustainable Cities," Journal of Intelligent Systems and Internet of Things, vol. 11(2), pp. 75-84, 2024. |
[14] |
Ashraf Elhendawi, Hany Omar, Emad Elbeltagi , Andrew Smith, "Practical approach for paving the way to motivate BIM non-users to adopt BIM," International Journal of BIM and Engineering Science, vol. 2(2), pp. 1-22, 2019. |
[15] |
Mohamed H. Shaban, Ashraf Elhendawi, "Building Information Modeling in Syria: Obstacles and Requirements for Implementation," International Journal of BIM and Engineering Science, vol. 1(1), pp. 42-64, 2018. |
[16] |
J. M. Arthur, "A Building Information Management (BIM) framework and supporting case study for existing building operations, maintenance and sustainability," Elsevier, 2015. |
[17] |
G.Carbonari, S. Stravoravdis, C. Gausden, "Building Information Model implementation for existing buildings for facilities management: a framework and two case studies," WIT PRESS, 2015. |
[18] |
Lina Alshibly, Mohammad shaban, "Impact of BIM implementation in engineering projects in Syria," International Journal of BIM and Engineering Science, vol. 7(2), pp. 64-74, 2023. |
[19] |
Fawaz Saleh, Ashraf Elhendawi, Abdul Salam Darwish, Peter Farrell, "An ICT-based Framework for Innovative Integration between BIM and Lean Practices Obtaining Smart Sustainable Cities," Fusion: Practice and Applications (FPA), vol. 14(2), pp. 68-75, 2024. |