International Journal of BIM and Engineering Science

Journal DOI

https://doi.org/10.54216/IJBES

Submit Your Paper

2571-1075ISSN (Online)

Volume 6 , Issue 2 , PP: 55-73, 2023 | Cite this article as | XML | Html | PDF | Full Length Article

Quality Assurance of Construction Design and Contractual Phases in Syria Within BIM Environment: A Case study

Dalia Yasser Rudwan 1 * , Rana Maya 2 , Natalija Lepkova 3

  • 1 Mastering in Building Information Modelling and Management BIMM program – Syrian Virtual University - (dalia_165121@svuonline.org)
  • 2 Department of Engineering and Construction management, Faculty of Civil Engineering, Tishreen University, Lattakia, Syria. - (t_rmaya@svuonline.org)
  • 3 Construction Management and Real Estate Dept., Civil Engineering Faculty, Vilnius Gediminas technical University, Lithuania - (Natalija.Lepkova@vgtu.lt)
  • Doi: https://doi.org/10.54216/IJBES.060204

    Received: November 16, 2022 Revised: January 18, 2022 Accepted: March 19, 2023
    Abstract

    Globally, the Quality Management System Research in the construction sector has not received sufficient attention compared to the industrial sector. The modern construction industry is known as complex due to magnitude of the projects on one hand, and the diversity of the works included in the project, on the other hand. The establishment of projects is no longer limited to the implementation of a few types of work or activities in the project. However, it is increasing in response to the overall technical and urban development of life, and to the increasing requirements of the beneficiaries of these projects. Projects nowadays are integrated and complex systems of different works and contracts, which are connected with each other to perform the overall function of the project, which, in return, has evolved as well as its qualitative content. This research aims to improve the quality of design, and contracting phase of the State Company for Engineering Studies in Damascus’s projects, by examining the current reality of practices and methods in quality management during the designing stages and pointing out its weaknesses. Determining the factors affecting the quality of the contractual phase of the company, through a survey published online. Twenty-two engineers working in the company have responded. It was estimated that the company's realities and the extent to which the employees understood the importance of quality.  Through this research, a system of procedures was proposed to ensure the quality of design and contractual phases with ISO 9001: 2015 Integrate it with building information modelling technology that addresses or overcomes current problems. Using BIM provides an effective means to increase the overall quality of the company's projects.

    Keywords :

    Quality Management, Quality assurance , Design Phase , Contract Phase , Building Information Modelling (BIM) , The General Company for Engineering Studies (GCES),  ,

    References

    [1] Al Jalali. M, 1997. Modern Trends in Construction Contracts and Management of Engineering Projects. Master Thesis, Ain Shams University.

    [2] Salamah. T, Shiban. A, & Alothman. K, 2023, Improving AEC Project Performance in Syria Through the Integration of Earned Value Management System and Building Information Modelling: A Case Study. International Journal of BIM and Engineering Science (IJBES), Vol. 06, No. 01, PP. 74-95, 2023.

    [3] Maya. R, Ahmad. D, 2019. Quality Management Evaluation of Study and Design for Engineering Projects According To the Administrative Functions (Case study: General Company for Engineering Studies and Consulting – Coastal Area Branch). Tishreen University Journal for Research and Scientific Studies - Engineering Sciences Series Vol. (41) No. (3) 2019.

    [4] Saleh. Q, Kher Allah, N, Al Jalali, M, 2006. Quality Management in Construction Projects in Syria. Damascus University Journal of Engineering Sciences, vol. (22) No. (1) 2006.

    [5] Safour. R, Ahmed. S, & Zaarour, B, 2021. BIM Adoption around the World. International Journal of BIM and Engineering Science, 4(2), pp. 49-63.

    [6] Yusof, N., Ishak, S. & Doheim, R., 2018. An Exploratory Study of Building Information Modelling Maturity in the Construction Industry. International Journal of BIM and Engineering Science, 1(1), pp. 6-19.

    [7] Elhendawi, A., 2018. Methodology for BIM Implementation in KSA in AEC Industry. Master of Science MSc in Construction Project Management ed. Edinburgh, UK: Edinburgh Napier University, UK.

    [8] Ismail. R, Jdeed, D. & Zaarour. B, 2022, PV Pre-cooling system for the Engineers Association Branch in Latakia. International Journal of BIM and Engineering Science (IJBES) Vol. 05, No. 02, PP. 38-46, 2022.

    [9] Saada. M, & Aslan. H, 2022, The effectiveness of applying BIM in increasing the accuracy of estimating quantities for public facilities rehabilitation projects in Syria after the war. International Journal of BIM and Engineering Science (IJBES) Vol. 05, No. 02, PP. 08-18, 2022.

    [10] Shaban, M. & Elhendawi, A., 2018. Building Information Modelling in Syria: Obstacles and Requirements for Implementation. International Journal of BIM and Engineering Science, 1(1), pp. 42-64.

    [11] Banawi, A., Aljobaly, O. & Ahiable, C., 2019. A Comparative Review of Building Information Modelling Frameworks. International Journal of BIM and Engineering Science, 2(2), pp. 23-49.

    [12] Elhendawi, A., Smith, A. and Elbeltagi, E., 2019. Methodology for BIM implementation in the Kingdom of Saudi Arabia. International Journal of BIM and Engineering Science, 2(1).

    [13] Safour. R, & Ahmed. S, 2023, Teaching BIM as an integrated Multidisciplinary program (Case study Syrian virtual university). International Journal of BIM and Engineering Science (IJBES) Vol. 06, No. 01, PP. 52-73, 2023.

    [14] Hamma-adama. M, Kouider. T, & Salman. H, 2020. Analysis of barriers and drivers for BIM adoption. International journal of BIMa and engineering science, 3(1), pp. 18-41

    [15] Ahmed. S, Dlask. P, Selim. O, & Elhendawi. A, 2018. BIM Performance Improvement Framework for Syrian AEC Companies. International Journal of BIM and Engineering Science, 1(1), pp. 21-41.

    [16] Elhendawi. A, Omar. H, Elbeltagi. E, & Smith. A, 2020. Practical approach for paving the way to motivate BIM non-users to adopt BIM. International Journal of BIM and Engineering Science, 2(2), pp. 1-22.

    [17] Evans, M, Farrell, P, Elbeltagi, E, Mashali, A. and Elhendawi, A, 2020. Influence of partnering agreements associated with BIM adoption on stakeholder's behaviour in construction mega-projects. International Journal of BIM and Engineering Science, 3(1), pp.1-20.

    [18] Elgendi, A., Elhendawi, A., Youssef, W. & Darwish, A., 2021. The Vulnerability of the Construction Ergonomics to Covid-19 and Its Probability Impact in Combating the Virus. International Journal of BIM and Engineering Science, 4(1), pp. 1-19.

    [19] Abd Alnoor, B., 2022. BIM model for railway intermediate station: transportation perspective. International Journal of BIM and Engineering Science, 4(2), pp. 33-48.

    [20] Al Hammoud, E., 2021. Comparing BIM Adoption Around the World, Syria’s Current Status and Furture. International Journal of BIM and Engineering Science, 4(2), pp. 64-78.

    [21] Mashali. A, & El tantawi. A, 2022. BIM-based stakeholder information exchange (IE) during the planning phase in smart construction megaprojects (SCMPs). International Journal of BIM and Engineering Science, 5(1), pp. 08-19.

    [22] Salami. H, & Alothman. K, 2022. Engineering Training and its Importance for Building Information Modelling. International Journal of BIM and Engineering Science, 5(1), pp. 41-60.

    [23] Dalloul. F. & Saod. Lama, 2023. Proposing a framework for introducing the concept of engineering digitization to develop curricula: case study - Tishreen University, Faculty of Civil Engineering. International Journal of BIM and Engineering Science (IJBES) Vol. 06, No. 01, PP. 34-51, 2023.

    [24] Al Hammoud. E & Ahmed. S, 2022. Submitting BIM to the Educational Plan for the Faculty of Architecture According to NARS and ARS Standards. International Journal of BIM and Engineering Science, 5(1), pp. 20-40.

    [25] Kotb¹, Mostafa, Atwa² Mohammed Saad, Ashraf Elshabrawy³, (JUNE 2020) Applying Quality Management System and Effect on Execution of Construction Projects, Engineering Research Journal 166.,CV1 – CV23.

    [26] Kamel, M, 2016. Quality Management in BIM. The online journal entitled BIMarabia for Engineering Science. No (6) 2016.

    [27] Engineers Australia. 2005. Getting it Right the First Time: An Examination of an Industry Problem as it applies to Queensland and Recommendations for Solutions and Actions. Queensland, Australia: Queensland Division (Engineers Australia).

    [28] Tilley, P. a. (1997). Design and documentation deficiency-causes and effects. Proceedings of the First International Conference on Construction Process Reengineering, (pp. 703-712). Gold Cost, Australia.

    [29] Bubshait, A, & Abdulrazzak, A. (1996). Design Quality Management Activities. Journal of Professional Issues in Engineering Education and Practice, pp. 104-106.

    [30] CHUNG H, 1999-Understanding Quality Assurance in Construction. Taylor&Francis e-library, 3rd ed, London, 251.

    [31] NADA, V, 2005-Quality Management System Handbook for Product Development Companies.CRC PRESS, 1th ed, Florida, 326.

    [32] THROP, B, SUMNER, P. 2004-Quality Management in Construction. Grwer Publishing Limited, 1ed, England, 234.

    [33] CHUNG H, 1999-Understanding Quality Assurance in Construction. Taylor&Francis e-library,3rd ed, London,251.

    [34] HOYLED D, 2001-ISO9000 Quality System Handbook. Butterworth-Heinemann, 4th rd. London, 672.

    [35] BuildingSmart Finland. (2012). COBIM – common BIM requirements 2012 Series 6: Quality assurance. Cobim: Common BIM Requirements. Retrieved from http://www.en.buildingsmart.kotisivukone.com/files/en.buildingsmart.kotisivukone. com/COBIM2012/cobim_6_quality_assurance_v1.pdf

    [36] Nur Emma Mustaffaa), Shaun Kok Zhen Xiongb), Muzani Mustapa, Hamizah Liyana Tajul Ariffin and Fuziah Ismail Cite as: AIP Conference Proceedings 2428, 060004 (2021).

    https://doi.org/10.1063/5.0071177 . Published Online: 01 November 2021.

    [37] Abdel madjid, M, 2000. Foundations of scientific research for the preparation of university theses. Jordan, Amman: Al-Warraq Foundation.

    [38] OGC Office of Government Commerce (2003). Achieving Excellence in Construction, Procurement Guide 6: Procurement and Contract Strategies, Crown copyright, UK.

    [39] Groton, James P, and Smith, George Anthony (1998). “Weighing the Options.” Journal of Management in Engineering, ASCE, Vol. 14, No. 6, pp. 69-72.

    [40] Maya, R, 2021. Quality Management course. Master in Building Information Modelling and Management BIMM- Syrian Virtual University.

    [41] Shaban, M, Ahmad, S, 2022. BIM-based Contracts course. Master in Building Information Modelling and Management BIMM- Syrian Virtual University.

     

    Cite This Article As :
    Yasser, Dalia. , Maya, Rana. , Lepkova, Natalija. Quality Assurance of Construction Design and Contractual Phases in Syria Within BIM Environment: A Case study. International Journal of BIM and Engineering Science, vol. , no. , 2023, pp. 55-73. DOI: https://doi.org/10.54216/IJBES.060204
    Yasser, D. Maya, R. Lepkova, N. (2023). Quality Assurance of Construction Design and Contractual Phases in Syria Within BIM Environment: A Case study. International Journal of BIM and Engineering Science, (), 55-73. DOI: https://doi.org/10.54216/IJBES.060204
    Yasser, Dalia. Maya, Rana. Lepkova, Natalija. Quality Assurance of Construction Design and Contractual Phases in Syria Within BIM Environment: A Case study. International Journal of BIM and Engineering Science , no. (2023): 55-73. DOI: https://doi.org/10.54216/IJBES.060204
    Yasser, D. , Maya, R. , Lepkova, N. (2023) . Quality Assurance of Construction Design and Contractual Phases in Syria Within BIM Environment: A Case study. International Journal of BIM and Engineering Science , () , 55-73 . DOI: https://doi.org/10.54216/IJBES.060204
    Yasser D. , Maya R. , Lepkova N. [2023]. Quality Assurance of Construction Design and Contractual Phases in Syria Within BIM Environment: A Case study. International Journal of BIM and Engineering Science. (): 55-73. DOI: https://doi.org/10.54216/IJBES.060204
    Yasser, D. Maya, R. Lepkova, N. "Quality Assurance of Construction Design and Contractual Phases in Syria Within BIM Environment: A Case study," International Journal of BIM and Engineering Science, vol. , no. , pp. 55-73, 2023. DOI: https://doi.org/10.54216/IJBES.060204