1675 1244
Full Length Article
International Journal of BIM and Engineering Science
Volume 2 , Issue 1, PP: 22-38 , 2019 | Cite this article as | XML |PDF

Title

BIM Implementation Maturity Level and Proposed Approach for the Upgrade in Lithuania

  Natalija Lepkova 1 * ,   Rana Maya 2 ,   Sonia Ahmed 3 ,   Vaidotas Šarka 4

1  Vilnius Gediminas Technical University, Vilnius, Lithuania
    (Natalija.Lepkova@vgtu.lt)

2  Tishreen University, Syria
    (mayarana98@gmail.com)

3  BIMarabia, Czech Republic
    (sonia@bimarabia.com)

4  Vilnius Gediminas Technical University, Vilnius, Lithuania
    (Vaidotas.Sarka@vgtu.lt)


Doi   :   https://doi.org/10.54216/IJBES.020102


Abstract :

Recently, Building information modelling (BIM) proves its capability to solve the raised AEC industry issues. Therefore, several countries and entities pursue to transform into BIM especially the developed countries. Lithuania as a European country has a great challenge to cap up with the surrounding environment to implement BIM. This study aims to determine the BIM maturity levels in Lithuania and supposed the missed steps to upgrade to the next level. Eighteen important Lithuanian construction projects awarded the most successful implementing BIM are chosen as a case study. Face-to-face interviews were conducted with several BIM experts whose work at the chosen projects. The analysis conducted by the most effective theoretical model entitled BIM Maturity Matrix (BIMM). The key findings of this research that Lithuania reached the BIM implementing maturity level 2 while some projects still at level 1 that proves the ability of Lithuanian AEC industry to softly and completely transfer the maturity to level 2 by the recommendation provided through the proposed approach at the end of the paper. These results provide a stunning opportunity to improve the AEC project performance and reap the benefits of implementing BIM. Future studies can develop a framework to improve the BIM implementation in Lithuania softly.

Keywords :

BIM; BIM maturity model; BIM stages; implementation maturity

References :

[1]     Abdirad, H., A. 2016. Metric-based BIM implementation assessment: a review of research and practice. Architectural Engineering and Design Management. DOI: 10.1080/17452007.2016.1183474 

[2]     Ahmed, S., 2018. The innovation of Syrian Building Processes by using BIM .Ph.D. Thesis. Faculty of Civil Engineering, Czech Technical University in Prague. 2018.

[3]     Ahmed, S., Dlask, P., Shaban, M., Selim, O., 2018. Possibility of Applying BIM in Syrian Building Projects. Proceedings of 17th International Scientific Conference ENGINEERING FOR RURAL DEVELOPMENT. ISSN 1691-5976. DOI:10.22616/ERDev2018.17.N101

[4]     Ahmed, S., Dlask, P., Selim, O. & Elhendawi, A., 2018. BIM Performance Improvement Framework for Syrian AEC Companies. International Journal of BIM and Engineering Science (IJBES), 1(1), pp. 21-41

[5]     Azzouz, A. & Hill, P. How BIM is assessed using Arup's BIM maturity measure? In: Chan, P.W. & Neilson, C. J., eds. 33rd Annual Association of Researchers in Construction.

[6]     Shaban, M. & Elhendawi, A., 2018. Building Information Modeling in Syria: Obstacles and Requirements for Implementation. International Journal of BIM and Engineering Science (IJBES), 1(1), pp. 42-64.

[7]     Bouška, R. 2016. Evaluation of maturity of BIM tools across different software

[8]     Chen, L., Luo, H., 2014. A BIM-based construction quality management model and its applications. Automation in Construction. 46. pp. 64-73.

[9]     Chen, P.-H., Nguyen, T., C., 2017. Integrating web map service and building information modeling for location and transportation analysis in the green building certification process. Automation in Construction. 77; 52-66.

[10]   Di Giuda, G. M.; Villa, V.; Piantanida, P. 2015. BIM and energy efficient retrofitting in school buildings, Energy Procedia 78: 1045–1050.

[11]   HM Government. 2012. Building Information Modeling, Industrial Strategy-Government, and Industry in Partnership, Government Report, London. 

[12]   Hochscheid, E., Halin, G. Micro BIM adoption in design firms: Guidelines for doing a BIM implementation plan. 2019, DOI: 10.13140/RG.2.2.18423.68004. at: https://www.researchgate.net/publication/333079784

[13]   Khosrowshahi, F., Arayici, Y. Roadmap for implementation of BIM in the UK construction industry, Engineering, Construction, and Architectural Management. 19 (2012) 610–635

[14]   Latiffi, A., A., Mohd, S., Brahim, J. 2014. Building Information Modeling (BIM) Roles In The Malaysian Construction Industry. DOI: 10.14456/ISEC.RES.2014/978-0-9960437-0-0_C-17_v5_150

[15]   LRSJ (2019). I-1240 Lietuvos Respublikos statybos įstatymas. [online] E-tar.lt. Available at: https://www.e-tar.lt/portal/en/legalAct/TAR.F31E79DEC55D [Accessed 1 Jul. 2019].

[16]   Management Conference, ARCOM 2017. Association of Researchers in Construction

[17]   Management, 35-44.

[18]   Maya Rana, Ali Kherbek, Banan Sakhta,” Enhancing the application of interoperability in the construction projects using IFC file format within BIM system”,  Tishreen University Journal for Research and Scientific Studies - Engineering Sciences Series Vol. (36) No. (5),2014.

[19]   Metallinos, P., Pantouvakis, J. BIM Implementation in Greek Public Construction Projects. Conference Paper · 2018. Available at: https://www.researchgate.net/publication/326176016

[20]   Migilinskas, D., Pavlovskis, M., Urba, I., & Zigmund, V. (2017). Analysis of problems, consequences, and solutions for BIM application in reconstruction projects. Journal of Civil Engineering and Management, 23(8), 1082-1090. https://doi.org/10.3846/13923730.2017.1374304

[21]   NBS (2019). [online] Nationalbimstandard.org. Available at: https://www.nationalbimstandard.org/files/NBIMS-US_V3_4.2_COBie.pdf [Accessed 1 Jul. 2019].

[22]   Oesterreich, D, T., Teuteberg, F., 2016. Understanding the implications of digitization and automation in the context of Industry 4.0, Computers in Industry, v.83 n.C, p.121-139, December 2016  [doi>10.1016/j.compind.2016.09.006]

[23]   Platforms. Procedia Engineering, 164. 481 – 486.

[24]   Rafiee, A.; Dias, E.; Fruijtier, S.; Scholten, H. 2014. From BIM to geo-analysis: view coverage and shadow analysis by BIM/GIS integration, Procedia Environmental Sciences 22: 397–402. http://dx.doi.org/10.1016/j.proenv.2014.11.037

[25]   Skaitmeninestatyba (2019). Digital Construction, 2018. The public institution. [online] Skaitmenine statyba. Available at: http://www.skaitmeninestatyba.lt/component/content/article/2-uncategorised/37-about-us [Accessed 1 Jul. 2019].

[26]   Skaitmeninestatyba (2019). Lithuanian BIM projects of the 2016 year. [online] skaitmeninestatyba. Available at: http://www..lt/lietuvos-bim-projektai/lietuvos-bim-projektai-2016 [Accessed 1 Jul. 2019].

[27]   skaitmeninestatyba (2019). Lithuanian BIM projects of the 2017 year. [online] skaitmeninestatyba. Available at: http://www.skaitmeninestatyba.lt/renginiai/210-konferencija-skaitmenine-statyba-2017-vilnius [Accessed 1 Jul. 2019].

[28]   Smith, P., 2014. “BIM Implementation -Global Strategies.” Procedia Engineering85482–92. DOI: 10.1016/j.proeng.2014.10.575

[29]   Smits, W., Buiten, M., Hartmann, T., 2017. Yield-to-BIM: impacts of BIM maturity on project performance, Building Research & Information, 45:3, 336-346, DOI: 10.1080/09613218.2016.1190579

[30]   Succar, B. (2009), “Building information modeling framework: a research and delivery foundation for industry stakeholders”, Automation in Construction, Vol. 18 No. 3, pp. 357-75.

[31]   Ustinovichius, L.; Peckienė; A.; Popov, V. 2017. A model for spatial planning of site and building using BIM methodology, Journal of Civil Engineering and Management 23(2): 173–182. https://doi.org/10.3846/13923730.2016.1247748

[32]   V. Novakova, S. Ahmed, S. Vitasek. 2018. Problems of technical education and lack of students at Czech technical universities. Proceedings of 17th International Scientific Conference Engineering for Rural Development. ISSN 1691-5976. DOI: 10.22616/ERDev2018.17.N295

[33]   Wikipedia (2019). Building information modeling. [online] Wikipedia. Available at: https://en.wikipedia.org/wiki/Building_information_modeling [Accessed 1 Jul. 2019].

[34]   Wu, C., Xu, B., Mou, C. and Li, X. (2017) Overview of BIM maturity measurement tools, ITcon Vol. 22 pg. 34-62, http://www.itcon.org/2017/3

[35]   Yusof, N., Mohd Ishak, S., Doheim, R., M., 2018. An Exploratory Study of Building Information Modelling Maturity in the Construction Industry. IJBES. V:1. ISSUE:1. PP: 6-20. Available at: www.BIMarabia.com.

 

[36]   Zhao, X. 2017. A scientometric review of global BIM research: Analysis and visualization, Automation in Construction 80: 37–47. https://doi.org/10.1016/j.autcon.2017.04.002.

 


Cite this Article as :
Style #
MLA Natalija Lepkova, Rana Maya, Sonia Ahmed, Vaidotas Šarka. "BIM Implementation Maturity Level and Proposed Approach for the Upgrade in Lithuania." International Journal of BIM and Engineering Science, Vol. 2, No. 1, 2019 ,PP. 22-38 (Doi   :  https://doi.org/10.54216/IJBES.020102)
APA Natalija Lepkova, Rana Maya, Sonia Ahmed, Vaidotas Šarka. (2019). BIM Implementation Maturity Level and Proposed Approach for the Upgrade in Lithuania. Journal of International Journal of BIM and Engineering Science, 2 ( 1 ), 22-38 (Doi   :  https://doi.org/10.54216/IJBES.020102)
Chicago Natalija Lepkova, Rana Maya, Sonia Ahmed, Vaidotas Šarka. "BIM Implementation Maturity Level and Proposed Approach for the Upgrade in Lithuania." Journal of International Journal of BIM and Engineering Science, 2 no. 1 (2019): 22-38 (Doi   :  https://doi.org/10.54216/IJBES.020102)
Harvard Natalija Lepkova, Rana Maya, Sonia Ahmed, Vaidotas Šarka. (2019). BIM Implementation Maturity Level and Proposed Approach for the Upgrade in Lithuania. Journal of International Journal of BIM and Engineering Science, 2 ( 1 ), 22-38 (Doi   :  https://doi.org/10.54216/IJBES.020102)
Vancouver Natalija Lepkova, Rana Maya, Sonia Ahmed, Vaidotas Šarka. BIM Implementation Maturity Level and Proposed Approach for the Upgrade in Lithuania. Journal of International Journal of BIM and Engineering Science, (2019); 2 ( 1 ): 22-38 (Doi   :  https://doi.org/10.54216/IJBES.020102)
IEEE Natalija Lepkova, Rana Maya, Sonia Ahmed, Vaidotas Šarka, BIM Implementation Maturity Level and Proposed Approach for the Upgrade in Lithuania, Journal of International Journal of BIM and Engineering Science, Vol. 2 , No. 1 , (2019) : 22-38 (Doi   :  https://doi.org/10.54216/IJBES.020102)