In recent years, the construction sector in Syria has witnessed increasing challenges related to the weak efficiency of engineering supervision, leading to increased costs, delayed completion, and recurring field conflicts between different disciplines. In light of the digital transformation taking place in the global construction sector, Building Information Modeling (BIM) has emerged as a modern technical solution capable of improving the quality and effectiveness of supervision. From this perspective, this study analyzed the impact of implementing Building Information Modeling (BIM) on enhancing the efficiency of engineering supervision in Syrian projects, by assessing its role in improving information quality, controlling schedules, and reducing errors and costs. The study adopted a descriptive analytical approach supported by a field study. A comprehensive questionnaire was developed, including 24 criteria covering all aspects of engineering supervision, and distributed to a sample of 90 supervising engineers in the public and private sectors. The results showed that adopting BIM clearly contributes to improving the accuracy of information and facilitating its exchange between parties, early detection of field conflicts prior to implementation, enhancing progress monitoring, and reducing rework rates. This increases supervision efficiency and achieves cost and time savings. However, the study revealed obstacles that limit the implementation of BIM in Syria, most notably weak digital infrastructure, a shortage of qualified personnel, the absence of regulatory policies supporting digital transformation, and weak training and qualifications in Syrian university curricula. The study concluded the need to adopt clear government policies mandating the use of BIM in major projects, develop specialized training programs for engineering supervisors, and establish a Common Data Environment (CDE) that supports digital integration among all parties. The results also confirmed that the shift to digital supervision using BIM is no longer just a technical option, but rather a strategic step to improve the efficiency of construction projects in Syria and ensure their sustainability.
Engineering Supervision Efficiency , Building Information Modeling (BIM)
[1] Salim, O., “What is Building Information Modeling (BIM)?,” BIM Arabia, no. 12, p. 4.
[2] M. Saudi, H. Al-Shimi, M. Mahdi, and S. Ashur, “Strategies for designing sustainable cities using Building Information Modeling (BIM),” Article, p. 6.
[3] H. Muhammad, “Methodology for integrating sustainable design strategies into Building Information Modeling (BIM): Current capabilities and future prospects,” Article, 2012, p. 5.
[4] N. Samaan, “The impact of applying Building Information Modeling (BIM) in engineering projects,” Al-Baath University Journal, no. 8, pp. 71–72, 2021.
[5] R. Sacks, C. M. Eastman, G. Lee, and P. Teicholz, BIM Handbook: A Guide to Building Information Modeling for Owners, Designers, Engineers, Contractors, and Facility Managers, 3rd ed. Hoboken, NJ, USA: John Wiley & Sons, 2018, pp. 15–16.
[6] M. F. Hergunsel, “Benefits of building information modeling for construction managers and BIM scheduling,” M.S. thesis, Dept. Civil Eng., Worcester Polytechnic Institute, Worcester, MA, USA, May 2011, p. 5.
[7] M. Youssef, R. Bahy El-Din, S. Surkn, and E. I. Badr, “A holistic vision to achieve sustainability standards using building information modeling technology,” Journal of Engineering, Art and Humanities, 2023, p. 623.
[8] VINCI Facilities, BIM for Facility Management Handbook and Technical Specifications for the Digital Model, Les Cahiers Experts Supplement, Groupe Monitor, Apr. 2016, p. 4.
[9] Presidency of the Syrian Arab Republic, Legislative Decree No. 3 of 1972 Regulating the Engineering Profession and the Engineers’ Syndicate, 1972, pp. 112–117.
[10] Ministry of Public Works and Housing of the Syrian Arab Republic, Technical Supervision Manual for the Execution of Construction Projects. General Directorate of Planning and International Cooperation, 2014, pp. 35–40.
[11] F. Gang and W. Shu, “A framework for BIM-based quality supervision model in project management,” in Proc. Creative Construction Conf. 2019, M. Hajdu and G. Lajos, Eds. Cham, Switzerland: Springer, 2019, pp. 234–242.
[12] M. Shaban, B. Al Hassan, and A. S. Mohamad, “Digital transformation of quality management in the construction industry during the execution phase by integration of building information modeling (BIM) and cloud computing,” Building Engineering, vol. 2, no. 1, Art. no. 1132, 2024.
[13] H. Almujibah, “Assessment of BIM as a time and cost-saving construction management tool: Evidence from two-story villas in Jeddah,” Sustainability, vol. 15, no. 9, Art. no. 7354, 2023.
[14] J. Matos and G. Miranda, “The use of BIM in public construction supervision in Brazil,” Organization, Technology & Management in Construction, vol. 10, no. 1, Art. no. 0007, 2018.
[15] W. Tsai, Y. Liu, and H. Zhang, “BIM-based government engineering quality supervision system in China,” Journal of Asian Architecture and Building Engineering, vol. 23, no. 6, pp. 1966–1979, 2023.